Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 14, 2021     39-3 Control System Step 1-5 - (5 hours) Category: Controls
Fabricated the F-1089 Elevator Push Rod assembly cutting to size the aluminum tube and match drilled for pop rivets using the paper templates (attention to the scaling when copying ....).
As per instruction i used the primer internally and let it dry for a couple of days.
Installed the VA-111 threaded rod ends and riveted using pop rivets.
Installed the rod bearings with jam nut and stored away waiting for preliminary assembly
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.